2019, EGS, Burbo Bank Extension, Bathymetric Consents Survey

2019, EGS, Burbo Bank Extension, Bathymetric Consents Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

July 2024

Collection date:

August 2019 - September 2019

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

March 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Ørsted Power contracted EGS international Ltd (EGSi) to undertake a bathymetric survey at Burbo
Bank Extension Wind Farm (BBW02) in the Irish Sea. Data was acquired in September 2019. 
Operations were undertaken using a hull mounted dual head Kongsberg 2040C.
The surveys were conducted onboard the EGS owned coastal survey vessel ‘The Watchful’, whi...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
8
Reports
3