Summary
The Marine Licence L/2013/00076 conditions associated with the Greater Gabbard Offshore Wind Farm (GGOWF) stipulate that elasmobranch monitioring must be undertaken post-construction. In order to fulfil these conditions a post-construction longline survey targeting elasmobranchs was undertaken between the 13th and 16th May 2014 within and adjacent ...