2007, Osiris Projects,  Barrow Offshore Wind Farm, Cable Route Inspection and Scour Monitoring Survey

2007, Osiris Projects, Barrow Offshore Wind Farm, Cable Route Inspection and Scour Monitoring Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2026

Collection date:

November 2007 - November 2007

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

On the instructions of Barrow Offshore Wind Limited, Osiris Projects were commissioned to undertake an inspection survey covering the proposed Barrow Offshore Wind Farm cable route, in conjunction with scour monitoring surveys at a dataset of selected turbine locations within the main development area. Data acquisition took place using the survey v...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Exposure and Route Position Listings

Select a Package from the list on the left to see more information about it