Summary
In May 2012 EGS (International) Ltd was contracted to undertake a bathymetric survey in the post-construction (operational) phase of the project to determine whether there are any changes to seabed morphology at the wind farm site including inter array cables. The survey covered all turbine foundations using a corridor 370 metre wide along the arra...