2008, E.ON, Humber Gateway, Onshore Environmental Statement

2008, E.ON, Humber Gateway, Onshore Environmental Statement

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2023

Collection date:

March 2008 - March 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This ES describes the impacts associated with the onshore elements of the proposed scheme. This covers the works above Mean High Water Springs (MHWS) and consists of: the underground cable that will connect the wind farm into the national electricity transmission system;the cable landfall works above MHWS; and any temporary construction areas. This...

Categories:
Birds
Environmental Statements
Noise
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
3

Data Highlights


Explore the wealth of the data gathered in the 2008, E.ON, Humber Gateway, Onshore Environmental Statement


7

Humber Gateway Offshore Wind Farm: Offshore Environmental Statement and Onshore Cable Route Environmental Statement