Summary
Turbidity monitoring, during construction of the 30-turbine offshore wind farm site at Kentish Flats, was undertaken to monitor cable laying impacts. Turbidity, potentially caused by the cable laying activity, was obtained by profiling through the water column using an OBS (YSI 6000), deployed from a moving vessel. During monitoring, at each 10 min...

