2002, HR Wallingford, Kentish Flats, Scoping Study

2002, HR Wallingford, Kentish Flats, Scoping Study

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

April 2002 - April 2002

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

This study was conducted by HR Wallingford Ltd on behalf of Global Renewable Energy Partners to assess the potential suitability of the proposed Kentish Offshore Wind Farm site and make suggestions for further studies.

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1